Apr 25
2010
I finished the green baby hat (Gansey Gayle Hat by Terry Morris) ahead of schedule. This is the fastest I’ve ever finished something (6days)! :) Six days the second time I knitted it, anyway. :)
I wanted to blog about it Friday a week ago, but even though the gift recipient likely doesn’t read my blog, I felt a bit tacky about posting pics ahead of time.
This is the first thing I’ve knitted from the “Calendar of things to knit” that I received as a Christmas gift last year. I was pleased. I’ll have to decide what to knit next from the calendar – Thanks, Lisa! :)
The baby shower was this afternoon and the mom-to-be liked it. :)
Here is a pic from the shower. It was cute and fun!(4/25/2010 8:09 pm)